In the Ore Mountains, there is a geological structure beneath the earth’s surface that has so far been little studied: the Petrovice-Döbra Zone. This is precisely where the planned Dresden–Prague railway tunnel is to run, and where the drinking water transfer tunnel to the Gottleuba Dam is to be built. To ensure that existing geological models of this area provide an even better basis for planning, researchers from the TU Bergakademie Freiberg are now collecting new data on both sides of the German-Czech border. The project team is particularly interested in how exactly groundwater flows through the subsurface in the drinking water protection area surrounding the Gottleuba Dam. To this end, three new groundwater monitoring points will be installed over the next two years, and geophysical measurements and hydrogeological tests will be carried out.
The Petrovice-Döbra Zone is a large-scale fault zone that divides the mountain range into a mosaic of small blocks. In geology, structural changes or fracture surfaces within a rock formation are referred to as faults. Their exact location in the region and how they behave when the subsurface is disturbed – for example, by construction work – have not yet been fully investigated. Furthermore, there has not yet been any cross-border research into how groundwater flows through this mosaic and how potential interventions in the subsurface affect its chemical composition and, consequently, water quality.
Better exchange of data and knowledge through cross-border research
The project will therefore provide the first comprehensive geophysical and hydrogeological description of the Petrovice-Döbra zone. The results will be incorporated into a new, detailed 3D geological model of the region and the Gottleuba Valley, as well as into a joint geographic information system (GIS). The partners in the research project are thus creating a uniform, standardised basis for data and decision-making – for authorities, companies, associations and interested members of the public on both sides of the border.
The project “Integrated geoscientific characterisation and cross-border assessment of the Petrovice–Döbra zone” began on 1 July 2026 and will run until 31 December 2028. It is funded by the European Union with approximately 1.25 million euros. The participants are the TU Bergakademie Freiberg (lead partner), the Czech Geological Survey and Charles University in Prague.
Information session for those interested
Anyone wishing to find out more about the project and the researchers will soon have the opportunity to do so: the kick-off symposium will take place on 25 November 2026, from 10.00 am to 3.30 pm, at the RINGEN Research Centre in Litoměřice. The team will present the project’s objectives and planned investigations. There will be presentations on previous and ongoing investigations in the area adjacent to the Erzgebirge Tunnel by the Geological Survey of Saxony, the Czech railway infrastructure operator Správa železnic and Deutsche Bahn, as well as opportunities for technical discussions and the exchange of experiences.
Further information on the project and the kick-off symposium